Subprocessor list in Solar design and proposal
Naming the actual subprocessors is what turns a privacy promise into something you can check.
0 of 19 companies we measured here publish it, that is 0%. Last checked 2026-10-18.
0% here against 7% across every category we measure. Solar design and proposal sits below the overall share for this criterion.
This page counts companies, not product entries: a company with two products in this category is one company here and two rows below.
Back to Subprocessor list across all categories, or to Solar design and proposal.
- Found0
- Not found at checked addresses19
- Not measured1
20 companies in total. Unmeasured companies are excluded from the published share.
Published
The actual list is published, not just a promise to keep one.
None of the companies we measured here published this.
No subprocessor list found.
We reached at least one address for each of these vendors and none of them carried it. That is what we found at the addresses we checked, on the date we checked them, and not a statement about what the vendor has.
| Vendor | What we found |
|---|---|
| Aurora Solar | 7 addresses checkedChecked |
| Bodhi | 7 addresses checkedChecked |
| Enact | 7 addresses checkedChecked |
| Enerflo | 7 addresses checkedChecked |
| EverBright | 7 addresses checkedChecked |
| GreenLancer | 7 addresses checkedChecked |
| OpenSolar | 7 addresses checkedChecked |
| Polysun | 7 addresses checkedChecked |
| PVcase | 7 addresses checkedChecked |
| RatedPower | 7 addresses checkedChecked |
| Scanifly | 7 addresses checkedChecked |
| Solar Nexus | 7 addresses checkedChecked |
| SolarEdge | 7 addresses checkedChecked |
| Solargraf | 7 addresses checkedChecked |
| Solarius | 7 addresses checkedChecked |
| SolarPlus | 7 addresses checkedChecked |
| Solo | 7 addresses checkedChecked |
| Terabase Energy | 7 addresses checkedChecked |
| Valentin Software | 7 addresses checkedChecked |
Not measured
We could not look at these, or their robots.txt asks us not to. That says something about our measurement, not about them, and they are left out of the percentage above.
| Vendor | What we found |
|---|---|
| Sunbase | The vendor’s server blocked or rate-limited our crawler, so this was not measured.Checked |
Other criteria in Solar design and proposal
- Data processing agreement
- Data location stated
- Status page with history
- Public pricing
- Certifications named
- HTTPS enforced with HSTS
- No third-party tracking before consent
- security.txt (RFC 9116)
- Notice before subprocessors change
- Named privacy contact
Subprocessor list in related categories
Found something we missed? Tell us. A correction moves that vendor into our next nightly run. That run reads the same fixed addresses we check for every vendor, not the address you send.