SaaS Ranking

Notice before subprocessors change in Construction management

A list is a snapshot. Art. 28(2) GDPR gives you a right to object, and that needs advance notice.

2 of 10 vendors we measured here publish it, that is 20%. Last checked 2026-09-02.

20% here against 10% across every category we measure. Construction management sits above the overall share for this criterion.

Back to Notice before subprocessors change across all categories, or to Construction management.

Published

The vendor commits publicly to giving notice before the list changes.

VendorWhat we found
Newforma https://www.newforma.com/dpa/
Procore https://www.procore.com/legal/subprocessors

No commitment to give notice before subprocessors change found.

We reached at least one address for each of these vendors and none of them carried it. That is what we found at the addresses we checked, on the date we checked them, and not a statement about what the vendor has.

VendorWhat we found
123erfasst 8 addresses checked
Aproplan 8 addresses checked
Archdesk 8 addresses checked
Bluebeam 8 addresses checked
Buildup 8 addresses checked
Capmo 8 addresses checked
Congrid 8 addresses checked
eSUB 8 addresses checked

Not measured

We could not look at these, or their robots.txt asks us not to. That says something about our measurement, not about them, and they are left out of the percentage above.

VendorWhat we found
Autodesk The vendor’s server blocked or rate-limited our crawler, so this was not measured.
Buildertrend The vendor’s server blocked or rate-limited our crawler, so this was not measured.

Found something we missed? Tell us and the next run picks it up.