SaaS Ranking

Notice before subprocessors change in Utility billing

A list is a snapshot. Art. 28(2) GDPR gives you a right to object, and that needs advance notice.

0 of 9 vendors we measured here publish it, that is 0%. Last checked 2026-09-02.

0% here against 10% across every category we measure. Utility billing sits below the overall share for this criterion.

Back to Notice before subprocessors change across all categories, or to Utility billing.

Published

The vendor commits publicly to giving notice before the list changes.

None of the vendors we measured here published this.

No commitment to give notice before subprocessors change found.

We reached at least one address for each of these vendors and none of them carried it. That is what we found at the addresses we checked, on the date we checked them, and not a statement about what the vendor has.

VendorWhat we found
Advanced Utility 8 addresses checked
Badger Meter 8 addresses checked
Bidgely 8 addresses checked
Cogsdale 8 addresses checked
Continental Utility 8 addresses checked
Hansen Technologies 8 addresses checked
Schleupen 8 addresses checked
SilverBlaze 8 addresses checked
Soptim 8 addresses checked

Not measured

We could not look at these, or their robots.txt asks us not to. That says something about our measurement, not about them, and they are left out of the percentage above.

None. Every vendor here was measured for this criterion.

Found something we missed? Tell us and the next run picks it up.